Posts tagged with "ttc"



19. June 2017
TTC Workshop 10 - 12 October 2017 in Binzen/Germany More Information & Registration

19. June 2017
TTC Workshop 19 – 21 September 2017 in Binzen/Germany More Information & Registration

18. March 2016
TTC Technology Training Center Workshop 05 – 07 JULY 2016 in Binzen / Germany Information & Registration

07. January 2016
TTC Workshop April 12-14, 2016 in Binzen / Germany This workshop on granulation and tableting is a perfect combination of theory, practical demonstrations and case-studies. The workshop provides the basics of granulating and compacting and outlines their applications in the powder processing industry. This workshop is the perfect investment for those who wish to acquire knowledge of the various methods of granulation and compaction. More Information and Registration

23. October 2015
TTC Technology Training Center Workshop 24 - 26 November 2015 in Binzen, Germany This workshop aims to elaborate the advantages and drawbacks of the individual techniques, focusing on the optimal spectrum of each one but also consider the economical and ergonomical aspects of manufacturing processes More Information & Registration

08. June 2015
New Workshops Continuous manufacturing in pharma A forward looking approach for the production of oral solid dosage forms Particle Engineering across the length scale From nano to macro

02. May 2015
On the one hand, increasing international competition is forcing companies to restructure business to improve their yields, efficiency, market share and, if possible, profit. On the other hand, institutions of higher education are insufficiently equipped to provide adequate practical training. http://ttc-binzen.de/cm/index.php?id=838

02. May 2015
Fluidized bed technology has been widely accepted by the food, feed, fine chemical and pharmaceutical industries as an appropriate and very versatile method for drying, granulation, pelletizing and functional film-coating. Originally, these processing options were used as batch and continuous operations for drying disperse products. During the past twenty years however, the number of continuous fluidized bed systems installed by the above referred to industries has dramatically increased for...

02. May 2015
Considering the trend towards prolonged operation time of production lines (up to 24 hours), breakdowns become almost unacceptable. Hence, an almost continuous operation of the facilities has to be warranted by preventive servicing and rapid detection and repair of malfunctions. This workshop provides a fundamental introduction to the Glatt philosophy of controls, documentation and RI-diagrams and is followed by an extensive practical trouble shooting session....